Übersicht

Veröffentlichungsdatum
21 Oktober 2015
Projektstatus
Referenz
Unterzeichnet | 09/06/2016
20150388
Projekttitel
Projektträger – Finanzintermediär
THEISTAREYKIR GEOTHERMAL PLANT
LANDSVIRKJUN
Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
Gesamtkosten (voraussichtlicher Betrag)
EUR 125 million
EUR 250 million
Ort
Sektor(en)
Beschreibung
Ziele

Development of an existing geothermal field and construction of a new geothermal power plant with a capacity of 90 MWe. The project is located 30 km south-east of Husavik. It is intended to provide additional supplies of electricity to meet the projected growth in electricity demand in the region. The first unit is intended to supply a new silicon metal plant while the remaining capacity will be sent to the national power grid.

The project consists of the design and construction of a 2 x 45 MWe geothermal power plant, along with its steam-gathering system, and wells in the north-east of Iceland. The exploration wells show good prospects. The power plant will provide electricity to a new industrial plant and support local economic growth.

Umweltaspekte
Auftragsvergabe

The project has been subject to a full environmental impact assessment (EIA) procedure in accordance with national legislation (Icelandic EIA Act no. 106/2000). The project would fall under Annex II of the EIA Directive if it was located inside the EU.

The environmental impact assessment was performed and completed in 2010 with the planning agency's positive opinion following public consultation.

The main environmental risk to the project relates to geological hazards (volcanic eruptions and earthquakes), while the main concerns from the project are related to noise during construction and impact on a protected lava field and nature conservation area, as the access road will cross it. Additionally, the project will emit carbon dioxide and hydrogen sulphide. Mitigation measures in line with industry practice are proposed.

Iceland, as a signatory to the European Economic Area (EEA) Agreement, has adopted EU procurement legislation. The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.

Link zum projekt
Andere Links

Dokumente

Umwelt- und Sozialverträglichkeitsprüfung - THEISTAREYKIR GEOTHERMAL PLANT EIA Summary
Datum der Veröffentlichung
30 Okt 2015
Sprache
Bereich
Finanzierung
Nummer des Dokuments
59786360
Thema
Umweltinformationen
Projektnummer
20150388
Sektor(en)
Regionen
Länder
Öffentlich zugänglich
Jetzt herunterladen
Formblatt ökologische und soziale Aspekte - THEISTAREYKIR GEOTHERMAL PLANT
Datum der Veröffentlichung
30 Jan 2016
Sprache
Bereich
Finanzierung
Nummer des Dokuments
64465138
Thema
Umweltinformationen
Projektnummer
20150388
Sektor(en)
Regionen
Länder
Öffentlich zugänglich
Jetzt herunterladen
Environmental and Social Completion Sheet - THEISTAREYKIR GEOTHERMAL PLANT
Datum der Veröffentlichung
21 Jan 2020
Sprache
Bereich
Finanzierung
Nummer des Dokuments
115247584
Thema
Umweltinformationen
Projektnummer
20150388
Sektor(en)
Regionen
Länder
Öffentlich zugänglich
Jetzt herunterladen
Andere Links

Aktuelles und Storys

Link zum projekt