Search En menu en ClientConnect
Search
Results
Top 5 search results See all results Advanced search
Top searches
Most visited pages

    Signature(s)

    Amount
    € 79,415,954.42
    Countries
    Sector(s)
    Honduras : € 79,415,954.42
    Transport : € 79,415,954.42
    Signature date(s)
    11/06/2015 : € 79,415,954.42
    Link to source

    Summary sheet

    Release date
    14 April 2015
    Status
    Reference
    Signed | 11/06/2015
    20140048
    Project name
    Promoter - financial intermediary
    HONDURAS SUSTAINABLE ROADS
    SECRETARIA DE INFRAESTRUCTURA Y SERVICIOS PUBLICOS
    Proposed EIB finance (Approximate amount)
    Total cost (Approximate amount)
    EUR 79 million
    EUR 168 million
    Location
    Sector(s)
    Description
    Objectives

    The project consists of the rehabilitation and upgrading of the road sections CA-11 La Entrada – El Florido and CA-4 La Entrada – Santa Rosa de Copán (in total 116 km). Both road sections form part of the Western Corridor of the primary national road network, connecting the second biggest city of the country – San Pedro Sula – to the international border crossings with Guatemala and El Salvador.

    The project contributes to the EU's global objective of improving social and economic infrastructure, including road transport, in Latin American countries.

    Environmental aspects
    Procurement

    The project involves rehabilitation and upgrading works on pre-existing roads, including some limited re-alignment. If the project was located within the EU, it would fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, as amended, requiring screening to determine if EIA is required. A full EIA has been carried out. As part of the Bank's due diligence of the project, compliance with the relevant EU environmental and social principles, standards and practices will be verified. The Bank shall also verify the acceptability of the project in terms of likely environmental impacts and proposed mitigation and compensation measures.

    The Bank will require the promoter to ensure that implementation of the project will be done in accordance with the Bank's Guide to Procurement.

    Under ELM Guarantee
    Comments

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    This operation is covered by the EU Guarantee for EIB loans outside the EU.

    Link to source

    Disclaimer

    Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
    They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).

    Documents

    Environmental and Social Impact Assessment (ESIA) - HONDURAS SUSTAINABLE ROADS - EIA part 1/2
    Publication Date
    15 Apr 2015
    Document language
    Main Topic
    Lending
    Document Number
    58413343
    Document Focus
    Environmental Information
    Project Number
    20140048
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Impact Assessment (ESIA) - HONDURAS SUSTAINABLE ROADS - EIA part 2/2
    Publication Date
    15 Apr 2015
    Document language
    Main Topic
    Lending
    Document Number
    58423455
    Document Focus
    Environmental Information
    Project Number
    20140048
    Sector(s)
    Countries
    Publicly available
    Download now
    Non-Technical Summary (NTS) - HONDURAS SUSTAINABLE ROADS - NTS 2/2 La Entrada - Santa Rosa
    Publication Date
    18 Apr 2015
    Document language
    Main Topic
    Lending
    Document Number
    58498170
    Document Focus
    Environmental Information
    Project Number
    20140048
    Sector(s)
    Countries
    Publicly available
    Download now
    Non-Technical Summary (NTS) - HONDURAS SUSTAINABLE ROADS - NTS 1/2 La Entrada - El Florido
    Publication Date
    18 Apr 2015
    Document language
    Main Topic
    Lending
    Document Number
    58502377
    Document Focus
    Environmental Information
    Project Number
    20140048
    Sector(s)
    Countries
    Publicly available
    Download now
    Environmental and Social Data Sheet (ESDS) - HONDURAS SUSTAINABLE ROADS
    Publication Date
    17 Jun 2015
    Document language
    Main Topic
    Lending
    Document Number
    59794361
    Document Focus
    Environmental Information
    Project Number
    20140048
    Sector(s)
    Countries
    Publicly available
    Download now

    News & Stories

    General enquiries and comments

    The EIB is committed to open communication and encourages constructive stakeholder input regarding its activities.
    Enquiries and comments concerning the EIB’s involvement in a project or the financing facilities, activities, organisation and objectives of the EIB, can be sent to the EIB Infodesk.
    Alternatively, the EIB can be contacted through its external offices.
    Queries regarding details of a specific project, in particular when it is under appraisal by the EIB, should preferably be addressed directly to project promoters.

    Media enquiries

    Media-related enquiries can be addressed to the EIB Press Office. Please also visit our Media information section.

    Complaints mechanism

    Any complaint regarding alleged maladministration can be lodged via the EIB Complaints Mechanism. The European Ombudsman acts as an independent external accountability mechanism of the EIB.

    Zero tolerance against fraud and corruption

    The EIB has a zero tolerance policy on fraud or corruption. To report allegations of fraud and corruption relating to EIB-financed projects, please contact the Fraud and Investigation division. All complaints will be treated as strictly confidential and handled in line with the EIB investigation procedures and the Anti-Fraud Policy.

    Related publications