    Montant
    40 000 000 €
    Pays
    Secteur(s)
    Portugal : 40 000 000 €
    Énergie : 40 000 000 €
    Date(s) de signature
    21/10/2021 : 40 000 000 €
    Lien vers la source

    Fiche récapitulative

    Date de publication
    25 octobre 2021
    Statut
    Référence
    Signé | 21/10/2021
    20190833
    Nom du projet
    Promoteur – Intermédiaire financier
    ALCO SOLAR PV GREEN ENERGY LOAN
    GALP ENERGIA SGPS SA
    Montant BEI envisagé (montant approximatif)
    Coût total (montant approximatif)
    EUR 40 million
    EUR 80 million
    Lieu
    Secteur(s)
    • Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
    Description
    Objectifs

    Construction and operation of four photovoltaic power generation plants in Portugal with an installed capacity of 144 MWp.

    The operation will contribute to EU climate and energy objectives. In particular, it supports the EU-wide target of reaching 32% of energy from renewable sources in gross final energy consumption by 2030, as set out in the RE Directive (EU 2018/2001). It also contributes to the national renewable energy targets as laid out in Portugal's National Energy and Climate Plan (NECP). The financing of this project is in line with the Bank's priority energy lending related to renewable energy and climate action. In addition, the investments will be located in a cohesion region.

    Additionality and Impact

    The solar PV project produces renewable electricity and reduce carbon and air pollution, an externality. It contributes to meet the EU 2030 energy and climate targets and the NECP of Portugal. The financing of this project is in line with the Bank's lending priority objectives on Energy (Renewable Energy) as well as the transversal objectives on Climate Action (mitigation), Environmental Sustainability (Pollution Prevention Control) and Social and Economic Cohesion. The project is one of the first projects developed without any form of government support in Portugal, solely relying on wholesale market revenues without any form of government support. It thereby contributes to the policy objective to support the market integration of renewable energy projects, as set out in the EIB's Energy Lending Policy. The project has an economic return thanks to the quality of the solar resource in Southern Portugal and the decreasing cost of the technology. Moreover, the wholesale electricity market prices are not fully reflecting the value of the electricity (not factoring in fully the positive externalities, such as the reduction of greenhouse gas emissions and local air pollutants), resulting in a social benefit. EIB support contributes to demonstrate the quality of the project and financial viability of this business model in Europe. EIB financing will contribute to diversify the company's funding sources and lengthen the average maturity of the company's debt.

    Aspects environnementaux
    Passation des marchés

    The plants and the interconnection infrastructure falls within Annex II of the EIA directive (Directive 2014/52/EU amending the EIA Directive 2011/92/EU). The plants will connect to a new common substation 30/150kV through 30kv overhead lines. From there, the energy of the four plants will be evacuated through a common 150kv overhead line of ca. 17kms to reach an existing substation where a new position will be installed. According to the Promoter's information, the plants have been screened out by the competent authority, while the transmission line was screened in for an environmental impact assessment (EIA) process. The Promoter prepared an EIA study for the transmission line and the substation, and the environmental consent was issued in February 2020 (Declaracaode Impacto Ambiental). The plants and transmission line are located 3 to 6kms from their closest Natura 2000 sites (SCI and SPA Caldeirão, SCI Guadiana and SPA Vale do Guadiana).

    The Promoter has been assessed by the EIB as being a private company not subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the Promoter is subject to the EU public procurement legislation then the Bank would duly inform the Commission Services and would require the Promoter to apply those rules.

    Lien vers la source
    Fiche récapitulative

    Clause de non-responsabilité

    Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
    Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).

    Documents

    Fiche technique sur les aspects sociaux et environnementaux - ALCO SOLAR PV GREEN ENERGY LOAN
    Date de publication
    11 nov. 2021
    Langue
    Sujet général
    Prêts
    Numéro du document
    138836914
    Thématique du document
    Information Environnementale
    Numéro du projet
    20190833
    Secteur(s)
    Pays
    Disponible au public
    Télécharger maintenant

    À la une

    Informations et observations générales

    La BEI s’engage à communiquer de manière ouverte et encourage les parties prenantes à apporter des contributions constructives à ses activités.
    Les demandes ou observations concernant la participation de la BEI à des projets ou à des mécanismes de financement, ou concernant les activités, l’organisation et les objectifs de la BEI, peuvent être adressées à l’Infodesk de la BEI.
    Vous pouvez aussi prendre contact avec la BEI par l’intermédiaire de ses bureaux extérieurs.
    Veuillez, de préférence, adresser directement au promoteur du projet vos questions portant sur les détails d’un projet précis, notamment lorsque celui-ci fait l’objet d’une instruction de la BEI.

    Informations aux médias

    Les questions liées aux médias peuvent être adressées au service de presse de la BEI. Veuillez consulter également notre espace presse.

    Mécanisme de traitement des plaintes

    Toute plainte relative à une présomption de mauvaise administration peut être introduite auprès du Mécanisme de traitement des plaintes de la BEI. Le Médiateur européen agit en tant que mécanisme de recours indépendant externe à la BEI.

    Tolérance zéro face à la fraude et à la corruption

    La BEI pratique une politique de tolérance zéro face à la fraude et à la corruption. Pour signaler des allégations de fraude et de corruption en rapport avec des projets financés par la BEI, veuillez contacter la division Enquêtes sur les fraudes. Toutes les plaintes seront traitées de manière strictement confidentielle et selon les procedures d'investigation de la BEI et la politique antifraude.

    Publications connexes