Date de publication: 7 décembre 2015
Promoteur – Intermédiaire Financier
SENELEC SALieu
Description
This project entails the modernisation of the electricity transport and distribution networks in Senegal.
Objectifs
The proposed investment programme concerns the upgrade and modernisation of the electricity transmission and distribution networks in Senegal. In particular this comprises the densification and extension of the electricity network, inter-connection of currently isolated networks, modernisation of crucial distribution equipment and facilities, installation of 300,000 pre-paid meters, 15,000 smart meters for large electricity consumers, and the establishment of a modern customer-relationship-management system. Part of the funds provided by the EIB will be dedicated to rural electrification and to the development of the transmission and distribution network in the southern part of Senegal.
Secteur(s)
- Énergie - Production et distribution d'électricité, de gaz, de vapeur et d'air conditionné
Montant BEI envisagé (montant approximatif)
EUR 88 million
Coût total (montant approximatif)
EUR 159 million
Aspects environnementaux
If located in the EU, the project would fall under Annex II of the Environmental Impact Assessment (EIA) Directive 2011/92/EU, requiring the competent authority to determine the need for a full EIA. The status of the EIA process for all components that could require an EIA will be checked at appraisal. The impact that can be typically expected from the proposed activities relates to visual impact, vegetation clearance, impact on flying vertebrates, electromagnetic fields, noise nuisance, disturbance during construction, and possibly land acquisition and resettlement. The environmental and social aspects of the project will be assessed in detail during the appraisal.
Passation des marchés
The Bank will require the promoter to ensure that any procurement procedures are done in accordance with the Bank's Guide to Procurement and the relevant applicable EU public procurement rules.
Statut
Signé - 28/11/2016
Clause de non-responsabilité
Avant d’être approuvés par le Conseil d’administration et avant la signature des prêts correspondants, les projets font l’objet d’une instruction et de négociations. Par conséquent, les informations et données fournies sur cette page sont indicatives.
Elles sont fournies à des fins de transparence uniquement et ne peuvent être considérées comme représentant la politique officielle de la BEI (voir également les notes explicatives).