Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    100.310.963,95 €
    Länder
    Sektor(en)
    Finnland : 5.015.548,2 €
    Schweden : 95.295.415,75 €
    Bildung : 50.155.481,97 €
    Gesundheit : 50.155.481,98 €
    Unterzeichnungsdatum
    28/10/2021 : 2.507.774,1 €
    28/10/2021 : 2.507.774,1 €
    28/10/2021 : 47.647.707,87 €
    28/10/2021 : 47.647.707,88 €

    Übersicht

    Veröffentlichungsdatum
    10 November 2021
    Projektstatus
    Referenz
    Unterzeichnet | 28/10/2021
    20200941
    Projekttitel
    Projektträger – Finanzintermediär
    HEMSO HEALTH AND OTHER COMMUNITY INFRASTRUCTURES
    HEMSOE FASTIGHETS AB
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    SEK 1000 million (EUR 99 million)
    SEK 2331 million (EUR 230 million)
    Ort
    Sektor(en)
    Beschreibung
    Ziele

    The project will finance the construction of health and education infrastructure in Sweden and Finland.

    The project aims at providing new, state-of-the-art, elderly and preschool care facilities and schools. Such facilities will be constructed throughout Sweden and, to a lesser extent, in Finland.

    Additionality and Impact

    The project supports increasing access to social infrastructure throughout Sweden and Finland by ensuring the funding of real estate projects with a particular focus on decentralized locations, selected based on the need and/or insufficient level of social services, such as care for the elderly or pre-school children, or educational infrastructure. The new and upgraded infrastructure financed by the EIB will ensure access to high quality care and state of the art learning environments. The provision of care and education as well as the investments targeting climate change mitigation, generate significant positive externalities, leading to an aggregate underinvestment relative to the levels that would be socially optimal. Therefore, the use of public financing is justified to address the investment gap. It is worth mentioning that this is the second operation with the promoter, who has a strong experience developing social infrastructure properties in Sweden and Finland. The operation will ensure that the promoter has sufficient financial resources for the timely implementation of the project; it will allow the promoter to spread out its investments and ensure that the tenor of the loan aligns with the economic life of the asset being financed.

    EIB's financing is furthermore complementary to the other sources of financing accessible to the promoter. By providing a long term and flexible facility, the EIB is strengthening the capital structure of the promoter which is also to the benefit of private sector financiers.

    Umweltaspekte
    Auftragsvergabe

    Care and educational facilities are not specifically mentioned in the Environmental Impact Assessment (EIA) Directive 2014/52/EU amending the EIA Directive 2011/92/EU, though the project is covered by Annex II of the Directive in relation to urban development. During appraisal the Bank's services will verify whether and in which sub-projects an EIA is required by the competent authority, as well as assessing full environmental details. The Promoter intends to further improve on the buildings' energy efficiency compared to the relevant national minimum (NZEB) standards.

    The Promoter is a private company not operating in the utilities sector and not having a status of a contracting entity. Thus it is not covered by EU rules on procurement. However, if during the project appraisal, the EIB were to conclude that the Promoter is after all subject to EU public procurement legislation (Directive 2014/24/EU), then the Bank would require the Promoter to ensure that contracts for the implementation of the project will be tendered in accordance with the relevant applicable EU procurement legislation.

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - HEMSO HEALTH AND OTHER COMMUNITY INFRASTRUCTURES
    Datum der Veröffentlichung
    13 Nov 2021
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    141654166
    Thema
    Umweltinformationen
    Projektnummer
    20200941
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen