Suche starten De menü de ClientConnect
Suche starten
Ergebnisse
Top-5-Suchergebnisse Alle Ergebnisse anzeigen Erweiterte Suche
Häufigste Suchbegriffe
Meistbesuchte Seiten

    Unterzeichnung(en)

    Betrag
    942.599.817,92 €
    Länder
    Sektor(en)
    Schweden : 942.599.817,92 €
    Industrie : 942.599.817,92 €
    Unterzeichnungsdatum
    21/12/2023 : 36.419.921,7 €
    22/12/2023 : 44.180.350,18 €
    21/12/2023 : 45.524.902,12 €
    22/12/2023 : 362.877.619,52 €
    22/12/2023 : 453.597.024,4 €

    Übersicht

    Veröffentlichungsdatum
    27 Dezember 2023
    Projektstatus
    Referenz
    Unterzeichnet | 21/12/2023
    20220461
    Projekttitel
    Projektträger – Finanzintermediär
    NORTHVOLT ETT EXPANSION-LARGE SCALE BATTERY PLAN
    NORTHVOLT AB
    Vorgeschlagene EIB-Finanzierung (voraussichtlicher Betrag)
    Gesamtkosten (voraussichtlicher Betrag)
    USD 1050 million (EUR 951 million)
    USD 8098 million (EUR 7333 million)
    Ort
    Sektor(en)
    • Industrie - Verarbeitendes Gewerbe/Herstellung von Waren
    Beschreibung
    Ziele

    Design, construction, commissioning, ramp-up and operation of an innovative large-scale vertically integrated lithium-ion battery cell manufacturing facility with a capacity of 42 GWh, together with an upstream cathode active materials plant and a battery cell recycling facility. The production is intended for the supply of European automotive manufacturers for premium electric vehicle models currently under development. The Project is located at the Northvolt Ett site in Skellefteå in northern Sweden.

    The objective of the Project is to make a substantial contribution to the development of a competitive EU-based battery industry. The Project can be considered a key enabler for the development of the European EV industry.

    Additionality and Impact

    The Project is eligible under the Bank's policy objective "Innovation, digital and human capital - IDHC" as it concerns the implementation in Europe of an innovative advanced manufacturing technology for the production of cutting-edge li-ion battery cells.


    The Project makes a substantial contribution to the development of the EU-based battery industry, for which it can be considered a key enabler. The project caters for the transition to e-mobility by supplying the growing demand in Europe for EV Batteries with cutting-edge battery cells, thereby supporting the competitiveness of the EU automotive industry.


    Due to its enabling character for the transition to e-mobility the Project fully contributes to Climate Action (mitigation) objective and a small part of the project to environmental sustainability - circular economy. It meets the objectives of the Green Deal Industrial Plan proposed by the European Commission.


    The operation qualifies for InvestEU eligibility under the following main policy priority areas:

    SIW:

    1.1.6 Modernisation and decarbonisation of industry

    (a)       decarbonisation investments in industries, in particular transport, aiming at significant reduction or avoidance of GHG emissions; and

    (c)       investments in assets enabling the flow of low-carbon energy.


    Europe must master the de-carbonisation of its transport sector. This passes through the transformation of its automotive industry from supplying vehicles running on carbon fuels to vehicles running on electricity. This, in turn, requires the build-up of a European battery industry. Europe lags in the industrialisation of battery technologies and the related know-how.

    The Project addresses these failures. In addition, the Project

    (a) has the nature of a public good for that the operator or company cannot capture sufficient financial benefits (knowledge dissemination through technology transfer and education and skills of the local labour, and a lasting specialised infrastructure being made available at no or negligible cost);

    (b) generates externalities which the operator or company cannot internalise, such as climate mitigation.


    The Project will generate economic benefits that are greater than those captured by the investor's financial returns. The Project's external benefits are potentially high as it contributes to the establishment of an industrial value chain in Europe of a competitive battery technology. The Project will lead to important knowledge transfer to Europe. It will deploy advanced manufacturing activities and related skilled jobs in Europe. The Project will furthermore help create the conditions for the deployment of e-mobility, and the development of a cleaner and more sustainable transport system in Europe and lead to lower emissions of pollutants (health benefits) and CO2 (climate benefits) on the roads.


    The proposed non-recourse structure is innovative for this type of Project, traditionally financed through corporate loans by commercial banks at sponsors' level. EIB's capability to appraise and structure the Project with unmatched terms and conditions on the commercial market would bring significant added value to the Promoter. EIB will not only close a large financing gap but also crowd-in other financiers. The increased risk profile of the loan beyond what the Bank traditionally regards as acceptable can be considered thanks to Invest EU protection.


    The operation would not be carried out to the same extent by the EIB without the InvestEU support.

    Umweltaspekte
    Auftragsvergabe

    The Project concerns capital investments for the production of active battery materials and battery cells for lithium-ion batteries as well as recycling battery materials. These fall under the EIA Directive 2014/52/EU amending the EIA Directive 2011/92/EU. All environmental, operation health and safety issues including environmental authorisations will be reviewed during the due diligence process.

    The Promoter has been assessed by the EIB as being a private company not subject to EU rules on public procurement or concessions. However, if at the project appraisal, the EIB were to conclude that the Promoter is subject to the EU public procurement legislation then the Bank would duly inform the Commission Services and would require the Promoter to apply those rules.

    Milestone
    In Prüfung
    Genehmigt
    Unterzeichnet
    3 Mai 2023
    21 Dezember 2023

    Haftungsausschluss

    Bis Finanzierungen vom Verwaltungsrat genehmigt und anschließend unterzeichnet werden, befinden sich die Projekte in der Prüfungs- oder Verhandlungsphase. Die Angaben auf dieser Seite sind daher unverbindlich.
    Sie dienen lediglich der Transparenz und stellen nicht die offizielle EIB-Politik dar (vgl. auch die erklärenden Anmerkungen).

    Dokumente

    Formblatt ökologische und soziale Aspekte - NORTHVOLT ETT EXPANSION-LARGE SCALE BATTERY PLAN
    Datum der Veröffentlichung
    31 Jan 2024
    Sprache
    Bereich
    Finanzierung
    Nummer des Dokuments
    162768074
    Thema
    Umweltinformationen
    Projektnummer
    20220461
    Sektor(en)
    Länder
    Öffentlich zugänglich
    Jetzt herunterladen

    Aktuelles und Storys

    Allgemeine Fragen und Anmerkungen

    Die EIB betreibt eine offene Kommunikation und ermutigt Interessenträgerinnen und Interessenträger, sich konstruktiv einzubringen.
    Anmerkungen und Fragen zur Beteiligung der EIB an einem Projekt oder zu Finanzierungen, zur Arbeit, zur Organisation oder zu den Zielen der EIB können an den EIB Infodesk gerichtet werden.
    Alternativ können Sie über die Außenbüros der EIB Kontakt mit der Bank aufnehmen.
    Fragen zu Einzelheiten eines konkreten Projekts sollten möglichst direkt an den Projektträger gerichtet werden, besonders, wenn sich das Vorhaben bei der EIB noch im Prüfungsstadium befindet.

    Medienanfragen

    Medienanfragen können Sie an die Pressestelle der EIB richten. Bitte besuchen Sie auch unseren Pressebereich.

    Beschwerdemechanismus

    Für Beschwerden über mutmaßliche Missstände in der Tätigkeit der Bank steht der Beschwerdemechanismus der EIB zur Verfügung. Der Europäische Bürgerbeauftragte untersucht als unabhängige Stelle Beschwerden und verlangt Rechenschaft von der EIB.

    „Null Toleranz“ gegenüber Betrug und Korruption

    Die Bank duldet unter keinen Umständen Betrug oder Korruption. Bitte richten Sie Betrugs- oder Korruptionsbeschwerden direkt an die Abteilung Betrugsbekämpfung. Alle Beschwerden werden streng vertraulich und in Übereinstimmung mit den Untersuchungsverfahren der EIB und den Leitlinien für Betrugsbekämpfung behandelt.

    Weitere Veröffentlichungen